IC MSL Floor-Life & Baking Time Calculator
Check IPC/JEDEC J-STD-020 out-of-bag floor life limits (MSL 1–6) and J-STD-033 Table 4-1 reference baking times at 125 °C, 90 °C (≤5% RH) and 40 °C (≤5% RH) by package thickness and carrier temperature limit. Free, no sign-up.
Try real catalog examples with MSL traps:
Sourcing MSL 2–6 components with verified dry-pack?
Every MSL-sensitive quote from PartVane includes photographs of the sealed Moisture Barrier Bag (MBB), Humidity Indicator Card (HIC) and reel label before you pay. Specify your MSL and dry-pack requirements in your RFQ.
Request Dry-Pack Verified QuoteIPC/JEDEC J-STD-020 Floor-Life Reference Table
The floor-life clock starts as soon as the sealed Moisture Barrier Bag (MBB) is opened at factory ambient conditions (≤ 30 °C / 60% RH for MSL 2 through 5a; ≤ 30 °C / 85% RH for MSL 1).
| MSL Level | Allowable Out-of-Bag Floor Life | Ambient Condition | Catalog Examples on PartVane |
|---|---|---|---|
| MSL 1 | Unlimited | ≤ 30 °C / 85% RH | TPS1HC120CQDYCRQ1, SN65HVD1781DR |
| MSL 2 | 1 Year (8,760 hours) | ≤ 30 °C / 60% RH | LM72630QRRXRQ1, AMC1200BDWVR |
| MSL 2a | 4 Weeks (672 hours) | ≤ 30 °C / 60% RH | High-density QFN / fine-pitch analog ICs |
| MSL 3 | 168 Hours (7 days) | ≤ 30 °C / 60% RH | UCC33410RAQR, ESP32-C5HF4 |
| MSL 4 | 72 Hours (3 days) | ≤ 30 °C / 60% RH | AMC1200BDUB (DUB tube) |
| MSL 5 | 48 Hours (2 days) | ≤ 30 °C / 60% RH | Large-die exposed-pad power packages |
| MSL 5a | 24 Hours (1 day) | ≤ 30 °C / 60% RH | Ultra-sensitive stacked-die / optical packages |
| MSL 6 | Time on Label (TOL) | Bake before use | Reflow strictly within label TOL window |
J-STD-033 Table 4-1 Reference Bake Times (Floor Life Exceeded > 72 Hours / Saturated)
Values below list the conservative saturated (> 72 hours over floor life) J-STD-033 Table 4-1 drying schedules. Shorter bake times exist in J-STD-033 when floor life was exceeded by ≤ 72 hours. Packages thicker than 4.5 mm or large BGAs/stacked-die devices above 17 × 17 mm require manufacturer / J-STD-033 Appendix B bake rules.
| Body Thickness | MSL Level | Bake @ 125 °C (High-Temp Tray) | Bake @ 90 °C, ≤ 5% RH | Bake @ 40 °C, ≤ 5% RH (In Reel/Tube) |
|---|---|---|---|---|
| ≤ 1.4 mm | MSL 2 | 5 hours | 17 hours | 8 days |
| MSL 2a | 7 hours | 23 hours | 9 days | |
| MSL 3 | 9 hours | 33 hours | 13 days | |
| MSL 4 | 11 hours | 37 hours | 15 days | |
| MSL 5 | 12 hours | 41 hours | 17 days | |
| MSL 5a | 16 hours | 54 hours | 22 days | |
| > 1.4 mm to 2.0 mm | MSL 2 | 18 hours | 63 hours | 25 days |
| MSL 2a | 21 hours | 3 days (72 h) | 29 days | |
| MSL 3 | 27 hours | 4 days (96 h) | 37 days | |
| MSL 4 | 34 hours | 5 days (120 h) | 47 days | |
| MSL 5 | 40 hours | 6 days (144 h) | 57 days | |
| MSL 5a | 48 hours | 8 days (192 h) | 79 days | |
| > 2.0 mm to 4.5 mm | MSL 2 – 5a | 48 hours | 10 days (240 h) | 79 days |
Related IQC tools: check chip lot age with our IC Date Code Decoder or verify package codes with the IC Top Marking Lookup.
Frequently Asked Questions on MSL & Component Baking
What is the factory floor life for MSL 2, MSL 3 and MSL 4 components?
Under IPC/JEDEC J-STD-020 at ≤ 30 °C and 60% RH, MSL 2 components have a floor life of 1 year, MSL 2a has 4 weeks, MSL 3 has 168 hours (7 days), MSL 4 has 72 hours, MSL 5 has 48 hours and MSL 5a has 24 hours. MSL 1 is unlimited (≤ 30 °C / 85% RH), and MSL 6 requires baking before use with reflow inside the Time on Label (TOL).
Can I bake components on tape-and-reel or plastic tubes at 125 °C?
No. Standard tape-and-reel, plastic tubes and low-temperature trays are rated for ≤ 40 °C only. Under IPC/JEDEC J-STD-033, baking at 90 °C or 125 °C requires transferring components into high-temperature JEDEC trays or de-reeling first; otherwise use the 40 °C (≤ 5% RH) low-temperature dry-bake schedule.
Can two packages of the exact same IC have different MSL levels?
Yes. For example, TI’s AMC1200BDWVR (wide SOIC-8 DWV) is rated MSL 2 (1 year), AMC1200BDUBR (SOP-8 DUB tape-and-reel) is MSL 3 (168 hours), and AMC1200BDUB (SOP-8 DUB tube) drops to MSL 4 (72 hours). Always check the Moisture Barrier Bag (MBB) label and the datasheet Package Option Addendum before purchasing.
Does baking reset the J-STD-033 floor life clock?
Yes, completing the full J-STD-033 Table 4-1 drying bake schedule for the component’s MSL rating and package body thickness resets the floor life clock, provided the parts are immediately reflowed or resealed inside a dry Moisture Barrier Bag (MBB) with fresh desiccant and a Humidity Indicator Card (HIC).