NXP TJA1021T — /10 or /20?
The part that catches people out: the suffix is not a package code and not a revision. It sets the bus slew rate. Order the wrong one and the part fits the footprint, passes incoming inspection and still will not run your bus at speed.
The suffix is the bus speed class
| Ordering code | Slope class | Maximum baud rate | Optimised for |
|---|---|---|---|
| TJA1021T/10 | Low slope | 10.4 kBd | SAE J2602 |
| TJA1021T/20 | Normal slope | 20 kBd | Maximum specified LIN speed |
The package is a separate letter. T is SO8, TK is HVSON8, and either package is available in either slope class. So a photograph of an SO8 part tells you nothing about whether it is a /10 or a /20 — only the full marking and the paperwork do.
This is why the substitution is dangerous rather than merely wrong: a /10 drops into a /20 footprint, looks correct on the board and passes a visual incoming check. The bus simply will not run at 20 kBd.
Source: NXP TJA1021 data sheet, Rev. 9, 10 February 2023 (nxp.com), read October 2026. Confirm against the current revision before you release a build.
The newer A and B naming means the same thing
Rev. 9 of the data sheet introduces TJA1021AT(K) and TJA1021BT(K). In that revision the A variants are low slope, like /10, and the B variants are normal slope, like /20.
This matters when you are sourcing: a supplier offering you TJA1021BT against a request for TJA1021T/20 may well be offering the right electrical part under the current naming — or may be guessing. Ask which data sheet revision the offer is based on, and get the full marking before you accept it as equivalent. We will not record an A or B part as a drop-in for a /10 or /20 without that confirmation in writing.
What we could not verify
Orderable part numbers carry further trailing codes, for example TJA1021T/20/C,118. These normally relate to ordering, packing quantity and qualification level, but we have not confirmed the meaning of each field against NXP ordering documentation, so we will not restate it as fact here.
If your drawing specifies the full orderable code including those fields, send it exactly as written. We quote the code you give us rather than a shortened form.
How we quote a line like this
- We quote against a named lot with its date code, not against a catalogue entry.
- /10 and /20 are quoted as different parts. No substitution between slope classes, and no A/B substitution, without your written approval.
- You get photographs of the actual parts and the reel or bag label before you pay. For a YYWW marking our date code decoder gives the calendar reference.
- Condition is stated plainly — new original and tested pulls are different products at different prices.
- Counterfeit or defective parts carry a 90-day guarantee from delivery. See payment, shipping and returns.
Ask us to source this
Sourcing LIN or CAN transceivers in quantity? Send the line — we quote against a named lot with its date code.